COPLAS'10 - Auxiliary Proceedings - AI Planning with Time and Resource Constraints, F. Dvořák, R. Barták
- Cost-Optimal Planning using Weighted MaxSAT, N. Robinson, C. Gretton, Duc-Nghia Pham, A. Sattar
- A Pseudo-Boolean approach for Solving Planning Problems with IPC Simple Preferences, E. Giunchiglia, M. Maratea
- Tabu Search and Genetic Algorithm for Scheduling with Total Flow Time Minimization, M. A. González, C. R. Vela, M. Sierra, R. Varela
- Casting Project Scheduling with Time Windows as a DTP, A. Oddi, R. Rasconi,A. Cesta
- Weak and Dynamic Controllability of Temporal Problems with Disjunctions and Uncertainty, K. Brent Venable, M. Volpato, B. Peintner, N. Yorke-Smith
- On two perspectives in decomposing constraint systems: Equivalences and computational properties, C. Witteveen, W. van der Hoek, M. Wooldridge
- A Filtering Technique for the Railway Scheduling Problem, M. Arangú, M. A. Salido, F. Barber
|